
Asphalt provides unequaled ease of maintenance and rehabilitation. The most popular option for surface renewal of asphalt pavements is the “mill and fill” process, which allows close-coupling milling and paving operations, and this minimizes the area of lane closure. As with staged construction, the ability to perform these operations during periods of below-peak traffic provides a great benefit to road users. Using echelon paving, as well as night and weekend scheduling of work, means minimal inconvenience to traffic. The road can be opened to traffic in a matter of hours, rather than days or weeks. Again, the user-delay costs associated with the shorter work time means a tremendous saving for the traveling public and shipping businesses. Shorter lane closures also mean greater safety for vehicles traversing the work zone.
